As you can see the parging process is moving along now; note the smooth concrete surface. They will finish with the exterior first and then will move to the interior. Also pictured here is the roof terrace. You can see the low parapet wall. They will pour a reinforced concrete beam on top of it to tie everything together. Next we need to lay the waterproofing membrane on top of the slab. This should happen pretty soon. There is still a bunch of work to do, but the end is in sight. It is possible all will be finished in the next two months. But you never can tell...